MacDraft Professional, MacDraft PE version 6.05 now available

May 31, 2012

Minor updates and bug fixes comprise this iteration of both versions of MacDraft.

If you haven’t tried it yet, you can download a demo of each and use it for 14 days:

MacDraft Professional 14-day Trial

MacDraft PR 14-day Trial

Try these out and let us know how much you love them!

You’ll find all the info you need starting here.

What kind of Features Do you Crave in Ez-Architect?

May 28, 2012

The developer does update Ez-Architect periodically. We have not come up with many new feature ideas as we believe the program is very complete and powerful as is.

Here are a few things we’ve come up with:

Text tools
1. improve text functionality. Have text operate in the more common way:
Select the text tool, drag a box and start typing. If the text gets too big for the box, expand the box automatically instead of forcing the user to expand it.

2. When you select a text box to edit and you click in it, make the cursor land where you click instead of at the beginning of the text.

Layers
1. Enable users to re-order the layers.
2. allow users to arrange layers: bring to front/send to back. Example: if you make a plan and then you want to add a layer with floor colors or patterns, it’s not easy to get the carpet beneath the floor (and furniture, if any).

General
don’t require users to install as admin

Object Properties
Change Dimensions
1. Add option to keep the aspect ratio so if one dimension changes, the other changes automatically to keep the aspect ratio.

Speak soon if you have an opinion. The above suggestions are pretty minor and wouldn’t likely comprise a major upgrade.

But if you’ve got a feature you’re craving for, you really need to tell us. Our M.O. has always been to listen to our users as we go to new versions. So if you aren’t talking (writing), we can’t give you what you want. The people who use our software a lot are the best experts. So we’ll lend you an ear, if you’re willing to “speak.”


How the Flood Created an Island, Part 4: The Kitchen is Bare

May 14, 2012

Here we go again.

Soon the restoration specialists removed all the lower cabinets and all the appliances from the kitchen. They moved the refrigerator into the dining room; the stove and the dishwasher went into a trailer outside along with the cabinets. They had to trash the formica counter tops (which didn’t make me sad when I learned this—new counter tops would be fun. But that’s only the beginning). Of course I had to remove everything from the cabinets first. The stuff went into giant boxes that got stored in one of our rooms. We set aside the essential stuff that we’d need for ongoing meals. The sink ended up in the garage.

I must say that one advantage of this process, was that it made me look at all the stuff I had stored in those cabinets that I never really used. So there was a kind of liberation that happened in the process as I made piles of things I’d never use again, never to put put back in the kitchen.

After everything was removed, they put in the drying equipment again. The kitchen really felt big without cabinets, and pretty useless, too.

Actually that isn’t drying equipment, it’s something to filter the smells from the particle board. This is actually the new subfloor.

Since the old floor had asbestos, we had to have those kinds of specialists in to remove, I think it was, 3 layers of flooring. More on that next time… along with the removal of the wallpaper, which is gone in the above photo (and I don’t mean computer wallpaper)…